Law Offices of David M. Siegel Bankruptcy Law Firm  
Chicago Divorce Lawyer David M. Siegel

Listen to David Siegel's Personal Message
FREE Special Report  "5 Critical Mistakes Often Made When Hiring an Attorney & How to Make Sure That You Don't Make the Same Mistakes". Chapter 7 Bankruptcy Success
Receive FREE Special Report

I Respect Your Email Privacy

5 Chicago Area Office Locations (Click here to See All Office Locations)
Wheeling
All Correspondence   Chicago
By Appointment Only
790 Chaddick Drive
Wheeling, IL 60090
19 South LaSalle Street, Suite 707
Chicago, IL 60603
(847) 520-8100 (773) 276-6969

Chapter 7 Bankruptcy Success
Click here to view contents

WVON 1690 Radio
Listen to David Siegel on the radio


See David M. Siegel's appearance on FoxNews commenting on the current foreclosure crisis and how bankruptcy can be a solution


Bankruptcy Judge Schmetterer's Opinion (13)

United States Bankruptcy Court
Northern District of Illinois
Eastern Division

Transmittal Sheet for Opinions

Will this opinion be published? Yes

Bankruptcy Caption: In re S.M. Acquisition Co., d/b/a Stylemaster, Inc.

Bankruptcy No. 02 B 10723

Adversary Caption: American National Bank and Trust Company of Chicago

v. Matrix, IV, Inc.

Adversary No. 02 A 00283

Date of Issuance: January 13, 2005

Judge: Jack B. Schmetterer

Appearance of Counsel:

Attorney for Movant or Plaintiff: Shaw Gussis, Fishman, Glantz, Wolfson & Tobin, LLC

Attorney for Respondent or Defendant: Holland & Knight, LLC

Trustee or Other Attorneys: Funkhouser Vegosen Liebman & Dunn, Ltd. Gesas, Pilati, Gesas and Golin, Ltd.

UNITED STATES BANKRUPTCY COURT
NORTHERN DISTRICT OF ILLINOIS
EASTERN DIVISION

IN RE: ) )

S.M. ACQUISITION CO., d/b/a STYLEMASTER, )
INC., ) Bankruptcy No. 02 B 10723

Debtor ) ___________________________________________ ) AMERICAN NATIONAL BANK AND TRUST ) COMPANY OF CHICAGO, )

Plaintiff )
) Adversary No. 02 A 00283
v. )
)
MATRIX IV, INC., )
Defendant. )

ADDITIONAL FINDINGS OF FACT AND
CONCLUSIONS OF LAW FOLLOWING REMAND

PROCEDURAL HISTORY

This Adversary proceeding relates to the Chapter 11 bankruptcy case filed by S.M.

Acquisition Co. (“Stylemaster” or “Debtor”). Plaintiff American National Bank and Trust Company of

Chicago (“Bank” or “American”)1/ sued Matrix IV, Inc.(“Matrix”) seeking a declaratory judgment that its

lien in the Debtor’s molds (“collateral”) is superior to any lien possessed by Matrix.

Following trial, it was originally held and adjudged that while Matrix held a possessory lien on

subject molds under the Illinois Tool and Die Act, the Bank held the prior and therefore superior lien

granted to it by Debtor. American National Bank & Trust Co. of Chicago v. Matrix IV, Inc. (In re S.M. Acquisition Co.), 296 B.R. 452, 467-474 (Bankr. N.D. Ill. 2003) (“Stylemaster I”).

Upon appeal, the District Judge reasoned, as tothe determinationthatDebtorhadgranted a prior lien to the Bank, that there was insufficient evidence in the record to determine whether Debtor held

ownership rights in the collateral when it granted a lien to the Bank, since a party cannot grant a lien in

property if it does not have ownership rights in that property. American National Bank & Trust Co. of

Chicago v. Matrix IV, Inc. (Inre S.M. AcquisitionCo.),No. 03 CV7072, 2004 U.S.Dist.LEXIS 7485

* at 7-15 (N.D. Ill. April 29, 2004) (“Stylemaster II”). Accordingly, the proceeding was remanded here

byorderpermittingfurtherhearingsandevidenceonthelimitedissue ofwhetherStylemasterhadownership

rightsinitscollateralthatenabledit to grant the Bank a security interest on November 6, 1997, that byits

terms applied to property then owned by Stylemaster or after acquired (discussed in Stylemaster I, 296

B.R. at pp. 465 and 467). New evidence was taken here only on the remanded issue. For reasons detailed below in

Additional Findings ofFact and Conclusions ofLaw, itisfound and concluded that the Debtor either held

in 1997or lateracquiredsufficient ownership rightsinthe moldsto grant the Bank a security interest under

the 1997 security instrument. The original Findings and Conclusions were therefore warranted, under

which it was found and held that the Bank’s lien primed any lien held by Matrix.2/

2/ No further action may be taken by this Court due to the appealstillpendingbeforethe District Court. However, it is noted that a Memorandum Opinion on Plaintiff’s Motion to Strike Defendant’s EighthAffirmative Defenseswasprepared inApril of 2003, but cannot be found on the Docket, noristhe intended order granting that motionfound on the Docket. Authority is lacking here to remedy that omission unless the case is further remanded for that purpose.

- 3

-3

ADDITIONAL FINDINGS PERTAINING TO THE ISSUE OF OWNERSHIP3/

69. As of March 18, 2002, Matrix was in possessionof62 plastic injectionmolds. Plaintiff’s Reopened Revised Exhibit 70 identifies these molds by part, description, seller, and year purchased. The Exhibit also assigns each mold a reference number. In addition to the descriptive terms adopted by the parties,eachmoldwillsubsequentlybeidentifiedbyitsreferencenumber. (Pl.’s Reopened Rev. Ex. 70.)4/ The following plastic molds (found hereinbelow to be owned by the debtor S. M. Acquisition Company) were in possession of Matrix at the time of the original trial (“Molds”)5/:

1. 5991 B1 18. 1083B 35. 8960 H 52. 2060 L
2. 5991 L1 19. 1084 B 36. 5895 L 53. 2030 L2
3. 5502 B1 20. 8810 L 37. 9005 L 54. 6502 L
4. 1062 B 21. 8010L 38. 8960 L 55. 6980 L
5. 5502 L1 22. 8815 B 39. 8060 L 56. 2060 B
6. 1063 B 23. 5980 B1 40. 5895 B 57. 4300 B
7. 1064 B 24. 5980L1 41. 8960 B 58. 4300 H
8. 1061 B 25. 8815 F 42. 2042 L 59. 6990 L
9. 1061 L 26. 6000 X 43. 2042 B 60. 6991 L
10. 1062 L 27. 5990 B1 44. 2032 B 61. 5990 B2
11. 1063 L 28. 9005 B 45. 2000 X 62. 6980 B/I
12. 1064 L 29. 8040 L 46. 2030 L1
13. 5500 B 30. 8932 C 47. 2024 B
14. 5990 L1 31. 8932 X 48. 2030 B
15. 5500 L 32. 5995 R 49. 2022 L
16. 1081 B 33. 8932 W 50. 2022 B
17. 1082 B 34. 8932 H 51. 2050 B

3/ Findings ¶¶ 69-129 are new following the remanded hearing.

4/ “Pl.’s Reopened Ex.” and “Def.’s Reopened Ex.” refers to Plaintiff’s and Defendant’s documents admitted into evidence in the remanded trial.

5/ Molds 8960 L and 8060 L were each designated as #38 in Pl.’s Reopened Revised Ex. 70, but are renumbered here for clarity.

The Molds Purchased from Plastic
Product’s Bankruptcy Estate (“Bankruptcy Molds”)

70. PursuanttoaBillofSaledatedMay12,1994(“Billof Sale”) S.M.Acquisitionpurchased

twenty-one molds from Plastic Products Estate, a Chapter 11 Debtor in Possession, at a public sale

(“Bankruptcy Molds”). (Pl.’s Findings of Fact ¶ 5; Def.’s Findings of Fact ¶ 5.) The Bankruptcy Molds

are further identified on Plaintiff’s Reopened Revised Exhibit 70 as reference numbers 1-19, 27 and 56.

The Bill of Sale also transferred the name “ Stylemaster, Inc.” to S.M. Acquisition. (Pl.’s Reopened Ex.

2 ¶ (d)). Thereupon S.M. Acquisition began doing business as Stylemaster, Inc. S.M. Acquisition shall

hereafter be referred to as Stylemaster. The Bill of Sale further transferred title to and right of possession

oftheBankruptcyMoldstoStylemasterfreeand clearofallliens,charges, security interests and any other

encumbrances. (Pl.’s Findings of Fact ¶ 7; Def.’s Findings of Fact ¶ 7; Pl.’s Reopened Ex. 2.)

71. Plastic Products Estate had previously purchased all of the Bankruptcy Molds from Cost

Reductions Company. (Pl.’s Findings of Fact ¶ 6; Def.’s Findings of Fact ¶ 6.)

72. OnMay13,1994,thecourtenteredan“AmendedOrderApprovingSaleofSubstantially

AllofDebtor’sAssetsFreeand ClearofLiens atPublic Sale,”whichincludedapprovalofPlastic Products

Estate sale of the Bankruptcy Molds to Stylemaster. The court’s original Order Approving Sale of

Substantially All of Debtor’s Assets Free and Clear of Liens at Public Sale was dated May 11, 1994.

(Pl.’s Findings of Fact ¶ 8; Def.’s Findings of Fact ¶ 8.)

73. As of May 12, 1994 Stylemaster had title to each of the Bankruptcy Molds pursuant to

Bill of Sale executed by David Anderson, as the duly authorized representative of Plastic Products Estate,

a Chapter 11 debtor in possession. (Pl.’s Findings of Fact ¶ 39; Def.’s Findings of Fact ¶ 39.)

The Molds Ordered From Cost
Reductions Company (“Cost Reduction Molds”)

74. Duringtheyears1998,1998,and2000,Stylemasterorderedthirty-threemoldsfromCost

Reductions Company (“Cost Reduction Molds”). The Cost Reduction MoldsareidentifiedonPlaintiff’s

Reopened Revised Exhibit 70 as reference numbers 20-25, 28-50, 52, 57, and 60.

75. Cost Reductions is a mold broker located near St. Louis, Missouri. The

companycontractswithPortugesemold manufacturerstobuild moldsforitscustomersintheUnitedStates.

(Pl.’s Reopened Ex. 65, Tanner Dep. at 5, 42-43.) Cost Reductions Company (“Cost Reductions”) has

supplied molds to Stylemaster since 1991. (Pl.’s Reopened Ex. 65, Tanner Dep. at 7.) Since 1998 Cost

Reductions has used three different mold manufacturing companies to build molds for Stylemaster –

Cidacos Molds, Monoforma and Azemoldes. (Pl.’s Reopened Ex. 65, Tanner Dep. at 51-52.)

Stylemaster’s Ordering Procedure with Cost Reductions

76. Ms. Martha Williams (“Williams”) is the current president of Stylemaster. As of

Stylemaster’s filing in 2002, Ms. Williams was the president, chief executive officer, and chief operating

officer of Stylemaster. At all relevant times, Ms. Williams was responsible for contacting vendors and

authorizing the purchase of molds on Stylemaster’s behalf. Ms. Williams was also responsible for

specifying the location for delivery of the completed molds. (Pl.’s Finding of Fact ¶ 18; Def.’s Finding of

Fact ¶ 18; Williams Reopened Tr. 8/19/04 at 98-1016/; Pl.’s Reopened Ex. 65, Tanner Dep. at 8-11;

Laverty Tr. 8/17/04 at 68.)

6/ Reopened Tr. refers to the remandedtrialtranscriptdateandpages of the witness referred to. - 6

  1. Stylemaster ordered and purchased molds from Cost Reduction according to procedures described below.
  2. Ms. Williams would contact Mr. Barry Tanner (“Tanner”) of Cost Reductions to discuss engineering specifications, the type of product the mold would produce, and product design. (Pl.’s Reopened Ex. 65, Tanner Dep. at 8; Williams Reopened Tr. 8/19/04 at 98-99.)
  3. Ms. Williams would also submit drawings and other documents pertaining to the design of each mold. Ms. Williams would also seek the advice and input of Mr. Raymond C. Wenk, Sr. (“Wenk”) regarding the design of the molds. (Williams Reopened Tr. 8/30/04 at 44-45.)
  4. Based on these preliminary discussions and documents, Cost Reductions would send Stylemaster a quotation for each mold. The quotation included the mold’s price, freight, delivery, import duties, and related expenses. (Pl.’s Reopened Ex. 65, Tanner Dep. at 11, 32; Williams Reopened Tr. 8/19/04 at 122-124; Pl.’s Reopened Ex. 9.)
  5. The quotation also included mold specifications, standard mold features, and a payment schedule. The quotation included a notion that all “molds are to run fully automatic unless otherwise noted.” (Pl.’s Ex. 10 SMR 00010.) If Ms. Williams found the quotation to be acceptable, Stylemaster would send a signed purchase order to Cost Reductions. (Pl.’s Reopened Ex. 65, Tanner Dep. at 8.)
  6. After receipt of the purchase order, Mr. Tanner would forward a purchase order, mold specification sheet and other documentation to one of Cost Reductions’ mold manufacturers in Portugal. The manufacturer would then start building the mold according to Stylemaster’s specifications. (Pl.’s Reopened Ex. 65, Tanner Dep. at 8, 15.) Cost Reductions did not sign the purchase orders submitted by Stylemaster. (Williams Reopened Tr. 8/19/04 at 124.)

Terms and Conditions of Stylemaster’s Purchase Orders

83. Stylemaster’spurchaseorderscontaineddifferentandadditionaltermsthanthosesetforth

in Cost Reductions’ quotation.

84. StylemasterissuedpreprintedpurchaseorderformstoCostReductions. In all transactions

priorto 2000,Stylemaster’spurchaseorders (the “old purchaseorders”)containedpurchasinginformation

on the front and back. The front of the old purchase orders contained a description of the mold to be

purchased and general specifications and business terms, including terms relating to delivery, price and

payment. Plaintiff’s Reopened Exhibit 5 is a representative sample of the front of the old purchase orders.

85. Thebackoftheoldpurchaseorders contained additional terms and conditions. Plaintiff’s

Reopened Exhibit 4 is a representative sample of the back of the old purchase orders.

86. The Terms and Conditions provided, in pertinent part:

This order contains the entire agreement of the parties. No modification thereof will be binding upon us, unless in writing dated subsequently and signed by vendor and accepted in writing.

All materials furnished must be as specified. It is our privilege to return at seller’s expense: (a) merchandise received after date, or dates, specified;

(b) merchandise shipped in excess of this order; (c) merchandise not accordingto specifications;(d) merchandisethatisnotas represented;(e) defective goods.

No goods returned shall be replaced without our formal replacement order. All goods furnished are subject to our approval before acceptance.

  1. In 2000, Stylemaster began using computer-generated purchase orders (the “new
  2. However, the new purchase orders did not contain the terms and conditions

purchaseorders”). These purchase orders contained substantially the same information as the old purchase

orders. Plaintiff’s Reopened Exhibit 9 is a representative sample of the new purchase orders.

contained in the old forms and incorporated by reference a separately attached payment schedule. (Pl.’s Reopened Ex. 9 SMR 00007.) After the start of the year 2000, Stylemaster used the old purchase orders only for internal purposes and didnotsendthemtovendors. (Williams Reopened Tr. 8/19/04 at 91-96.)

89. As a result, beginning in 2000, Stylemaster did not issue any purchase orders containing the old terms and conditions. The Sampling Process of the Cost Reduction Molds

  1. Each injection mold took months to manufacture. (Williams Reopened Tr. 8/19/04 at 117.)
  2. During the manufacturing process, Cost Reductions and Stylemaster communicated regularly concerning the design and progress of each mold. The companies exchanged drawings and documents relating to mold specifications and revised and updated the designs for the mold.
  3. In an effort to make the manufacturing process as cost efficient as possible, each mold was sampled. The purpose of sampling was to determine a mold’s production capability and whether the mold would produce an acceptable product. Sampling entails running a mold to produce a sample product. The number of samples during the manufacturing process depends on the particular mold. The sample was sent to Stylemaster for review, evaluation, and approval.
    1. When these initial samples were run, the mold was not complete. The mold still required additionalworksuchasadding texture, inserting water lines, and polishing. This additional work was not completedbeforeinitialsampleswererunbecause it wascost prohibitive tomakedesignadjustmentsafter these finishing touches are performed. After approval of the initial sample, the mold maker prepared the
    2. moldforfinalsamples. Final samples were approved by the customer. Once final samples were approved each mold was shipped according to Stylemaster’s instructions.
  4. For the Cost Reductions Molds, the mold maker in Portugal ran all of the samples during the manufacturing process. (Pl.’s Reopened Ex. 65, Tanner Dep at 8, 15.)

95. Ms. Williams was responsible for final approval of all molds manufactured for Stylemaster or its predecessor in interest. (Pl.’s Finding of Fact ¶ 18; Def.’s Finding of Fact ¶ 18.) Ms. Williams approved the final samples of the Cost Reduction Molds in issue here. (Williams Reopened Tr. 8/19/04 at 107-108.) Delivery and Payment of the Cost Reduction Molds

  1. PursuanttothetermsofStylemaster’s purchase orders,CostReductionswasresponsible for shipping costs and clearing customs in the United States. Mr. Tanner testified that the mold manufacturer in Portugal would ship the completed molds to Cost Reductions’ customs clearing broker in the U.S. (Pl.’s Reopened Ex. 65, Tanner Dep. at 9-10, 76.) After clearing customs, Cost Reductions would ship the mold to the delivery location specified by Ms. Williams. In most instances, Ms. Williams directed Cost Reductions to shipped the Cost Reduction Molds directly from Portugal to Matrix.
  2. Mr. Tanner testified that delivery matured Stylemaster’s payment obligation. (Pl.’s Reopened Ex. 65, Tanner Dep. at 12-13.) Stylemaster paid for the Cost Reduction molds in monthly installments. (Pl.’s Reopened Ex. 65, Tanner Dep. at 12-13.) Upon delivery, Stylemaster put the Cost ReductionMoldsintoimmediateproductioningreatvolume,asexplainedfurtherbelow. (Findings ¶¶ 124127.)

The Molds Ordered from Chicago Mold Engineering Company, Inc. (“CME”)

  1. In 2001, Stylemaster ordered seven molds from Chicago Mold Engineering Co., Inc. (“Chicago Molds”). The Chicago Molds are identified on Plaintiff’s Reopened Revised Exhibit 70 as referencenumbers26, 51, 53-55, 58 and 59. (LavertyReopenedTr.8/17/04 at66; Pl.’sReopenedRev. Ex. 70.)
  2. CME is a mold manufacturer. CME has built molds for Stylemaster for over eight years. Unlike Cost Reductions, CME manufactures molds at its facilities inChicago, Illinois. (Pl.’s FindingofFact ¶ 21; Def.’s Finding of Fact ¶ 21; Laverty Reopened Tr. 8/17/04 at 63.)

Stylemaster’s Ordering Procedure with CME

  1. The purchasing process between Stylemaster and CME was substantially similar to the manner in which Stylemaster purchased molds from Cost Reductions. (Pl.’s Finding of Fact ¶ 21; Def.’s Finding of Fact ¶ 21.)
  2. For each mold, CME and Stylemaster engaged in preliminary discussions concerning its design,specifications,andcapacity. Ms. Williams would submit design drawings and specifications. CME wouldthensubmitaquotation. After Stylemaster approved the quotation, it would issue a purchase order. After receipt, CME would commence building the mold. (Laverty Reopened Tr. 8/17/04 at 85; Pl.’s Reopened Ex. 71 SMR 00775.) Stylemaster paid for each mold according to a payment schedule. (Laverty Reopened Tr. 8/17/04 at 74.) CME was fully paid by December of 2001. (Laverty Reopened Tr. 8/17/01 at 74.)

Sampling of the CME Molds

  1. AlthoughCMEmanufacturedmoldsatitsfacilities,itdidnotownthenecessaryequipment tosetupandsamplemolds. Stylemaster also did not have the capacity to run samples. (Laverty Reopened Tr. 8/17/04 at 112-113.) As a result, Matrix ran the samples for all of the Chicago Molds during the manufacturing process. CME shipped the Chicago Molds to Matrix for sampling and Matrix shipped the molds back during the various phases of the manufacturing process. (Laverty Reopened Tr. 8/17/04 at 76-88; Pl.’s Reopened Ex. 71 SMR 00775.)
  2. Like the Cost Reductions Molds, the Chicago Molds would go through two or more samplings during the manufacturing process. Mr. Laverty testified that CME first shipped the Chicago Molds to Matrix for initial samples in January 2001. After sampling, Matrix would return the molds to CME. Laverty would meet with Ms. Williams to discuss any additional changes. CME would then make the additional corrections and ship them back to Matrix. Matrix would run the final samples.
  3. Mr. Laverty testified that Stylemaster fully paid for all of the Chicago Molds by December 2001. (Laverty Reopened Tr. 8/17/04 at 74.) Stylemaster put the Chicago Molds into immediate production in great volume, as explained in detail below. (Findings ¶¶ 124-127.)

Repairs and Debugging

  1. Stylemaster directed both CME and Cost Reductions to ship molds to Matrix. Matrix housed these molds at its facilities.
  2. As Ms. Williams testified, she did not personally inspect each mold upon delivery but depended on Mr. Wenk to notify her regarding the condition and status of a particular mold.
  3. Stylemaster and Matrix entered into an agreement whereby Matrix would produce plastic products from the molds. After delivery of the molds to Matrix, Matrix would attempt to recreate the finished product based on the final sample. Each mold had to be “set-up” before it could be used in production. This included making adjustments to make sure that the mold was functioning properly and that it could meet the demands of a full production run.
  4. Matrix experienced problems with particular molds that necessitated debugging and repairs. Debugging meant that each mold had to be set-up, tested by running sample products, and modified and/or repaired to make sure that the tool could produce acceptable products. The debugging processenabledStylemasterto determine the productioncost foreachpart, which was used to derive the wholesale price charged to its customers.
  5. Several molds were delivered missing parts or containing defects. (Wenk Reopened Tr. 8/23/04 at 150.) As a result, Matrix had to be repair some of these molds before they could be put into production.
  6. BothStylemasterandthemoldmanufacturerspaidforrepairs. Ms. Williams testified that Stylemaster paid for repairs when the problems were caused by Stylemaster’s faulty designs. (For example, Stylemaster designed one mold with the wrong dimension on the stacking rib, (Williams Reopened Tr. 8/19/02 at 113-114.)) Ms. Williams further testified that CME or Cost Reductions paid for repairs if a mold did not run or ran only for a short period of time. (Williams Reopened Tr. 8/19/02 at 113-114.)

Problems with the Contempra Line Molds

111. Sometime in 1999, Ms. Williams designed a new product line referred to as the Contempra Line Molds. (Williams Reopened Tr. 8/20/2004 at 63-65.) Ms. Williams discussed the new product line with Mr. Wenk and asked him for suggestions regarding the engineering aspects of the Contempra Line Molds. Stylemaster contracted with both Cost Reductions and CME to manufacture moldsfor the ContempraLine in2000. The ContempraLine Moldsexperiencedsignificant problems after they were put into production and required substantial repair.

Cost Reductions Problems with Contempra Line Molds

  1. Cost Reductions contracted with Azemoldes to build the Contempra Line Molds. (Williams Reopened Tr. 8/20/04 at 63-64.) But Messrs. Tanner and Wenk, and also Ms. Williams, testifiedtothedifficultiesassociatedwiththeseMolds. Mr. Tanner testified that the Contempra Line Molds suffered from leaking injection manifolds and water leaks. (Pl.’s Reopened Ex. 65, Tanner Dep. at 24.)
  2. At some point in 2000, representatives from Cost Reduction and Azemoldes came toMatrix’sfacilitiestoevaluatetheinjectionmanifoldsoftheContempraLineMolds. (Williams Reopened Tr. 8/23/04 at 37.)
  3. Cost Reductions contracted to have a company called Swan Industries pick up and repairsomeoftheContempraLineMolds. (Pl.’s Reopened Ex. 65, Tanner Dep. at 25.) Cost Reductions then sampled the molds at Swan Industries to make sure the molds were working properly, and shipped thembacktoMatrix. (Pl.’s Reopened Ex. 65, Tanner Dep. at 27.) Cost Reductions paid for these repairs. (Williams Reopened Tr. at 80.) Matrix also repaired other molds from the Contempra Line. (Pl.’s Reopened Ex. 65, Tanner Dep. at 26.)

115. One mold from the Contempra Line, Mold WX02000, suffered from significant

defects. That Mold experienced significant leakage and other problems and was missing parts. (Wenk Reopened Tr. 8/23/04 at 199-200; Williams Reopened Tr. 8/23/04 at 45; Def.’s Reopened Ex. 107C MAX 06489-06493.) Mold WX 02000 is identified as Reference Number 44 in Plaintiff’s Reopened Revised Exhibit 70.

  1. Ms. Williams and Mr. Wenk testified that Mold WX 02000 had to be repaired several times by Cost Reductions and Matrix. Cost Reductions paid for the repairs.
  2. Sometime in 2000 or 2001, Matrix shipped Mold WX02000 to a company called Midwest Die Mold to test that Mold’s steel. Midwest Die Mold subsequently prepared a report of their examination. (Def’s Reopened Ex. 43; Wenk Reopened Tr. 8/30/04 at 10-11.) Mr. Wenk also sent a letter to Ms. Williams describing his recommendations concerning Mold WX0200's performance. (Def.’s Reopened Ex. 43.)
  3. After receiving these documents, Ms. Williams contacted Cost Reductions to make sure that Cost Reductions would pay for all repairs relating to this mold. Ms. Williams testified that she did not believe the Mold was incapable of producing the parts Stylemaster required, but she was concerned about maintenance issues.
  4. At one point Mold WX02000 was returned to Azemoldes in Portugal for repairs. Azemoldes completed the repairs and returned the mold to Matrix’s facility. Ms. Williams testified that although Mold WX02000 had several defects, the mold was put into production and produced over a million plastic products. (Williams Reopened Tr. 8/23/04 at 29-30.)
  5. After the defects were brought to Ms. Williams’ attention, Stylemaster continued to make payments for Mold WX02000. Ms. Willaims testified that Stylemaster fully paid for the Contempra Line Molds. (Willaims Tr. 8/23/04 at 110; Pl.’s Reopened Ex. 46.) Plaintiff’s Reopened Exhibit 76 references a series of payments from Stylemaster for the Contempra Line Molds.
  6. As Mr. Wenk testified, despiteproblemswiththeContempramolds,Matrixwasstillable to produce millions of parts after the molds were delivered and before they were repaired by Cost Reductions.
  7. CostReductionspaidMatrixinexcessof$90,000forrepairsmadetotheCostReduction Molds after they had been delivered to Matrix at Stylemaster’s direction.

CME Problems with Contempra Line Molds

123. Stylemaster contracted with CME to construct the Contempra Line Molds. Stylemaster returned the Contempra Line Molds to CME because they were producing unacceptable samples. Ms. Williams testified that Stylemaster submitted inaccurate design information. (Williams Reopened Tr. 8/19/02 at 114.) Stylemaster, for example, designed onemoldwiththewrongdimension on the stacking rib. (Williams Reopened Tr. 8/19/02 at 113-114.) CME made changes to these molds at the request of Ms. Williams. (Pl.’s Reopened Ex. 71 SMR 00762-00768.) Ms. Williams accepted the molds after the changes. Stylemaster paid for these changes. CME was fully paid by December 2001. (Laverty Reopened Tr. 8/17/04 at 74.)

Use of the Molds

  1. All the molds in issue here were put into production by Stylemaster through Matrix’s facilities. After July 25, 2001, Matrix produced in excess of nine million plastic pieces from the molds. Stylemaster marketed the plastic products to retail vendors and accepted orders for the plastic products.
  2. Stylemaster pre-sold its products, meaning that contractual agreements with retailvendorsthatobligatedStylemasterto produce a specific numberofplastic productswereenteredinto before the molds were completed.
  3. After shipment, Stylemaster insured and recorded each mold on its balance sheet. Stylemaster never returned or otherwise refused to keep any of the molds after approval of final samples and delivery to Matrix. Even when problems occurred with the molds after their initial delivery from the manufacturer, Stylemaster never rejected or returned any of the molds to Cost Reductions or CME. Stylemaster did not ask foranyrefund relatingto anyofthe moldsbut continuedto makepayments for the Molds.
  4. Many of the molds had the Stylemaster logo engraved onto them. Stylemaster did not license the logo to any third party.

128. After Cost Reductions completed its contractual performance, it did not assert any

right or interest in the Cost Reduction Molds. After CME completed its contractual performance, it did notassertany right or interest in the CMEMolds. The latest production date of plastic parts from any one of the molds was February 2002. (Pl.’s Finding of Fact ¶ 31; Def.’s Finding of Fact ¶ 31.)

129. Fact statements contained in the Additional Conclusions of Law shall also constitute Additional Findings of Fact.

ADDITIONAL CONCLUSIONS OF LAW AS TO OWNERSHIP ISSUE
INTRODUCTION

Preliminarily, revised Ill. UCC Article 9, which went into effect July 1, 2001, applies here even though the events under review occurred prior to that date. The revised Article 9 applies to all security interests “even if the transaction or lien was entered into or created before [the statute’s] effective date[.]” 810 Ill. Comp. Stat. 5/9-702 (2004).

Three requirements must be met to create an enforceable security interest under Illinois law: (1) value hasbeengivenbythe creditor;(2) the debtor hasrightsinthe collateralorthe power to transferrights inthe collateraltoa secured party; and (3) either the debtor has executeda securityagreement describing the collateral, or the collateral is not a certificated security and it is in possession of the secured party pursuant to the security agreement. 810 Ill. Comp. Stat. 5/9-203 (2004).

This Adversary has been remanded specifically to determine whether Stylemaster had sufficient ownership rights in the molds to enable it to grant a security interest to the Bank.

Neitherthe UniformCommercialCodenorthe versionadopted inIllinoisdefinesthe phrase"rights in the collateral." A panel of the Seventh Circuit has explained that the requirement of rights in collateral illustrates the general principal that “one cannot encumber another man’s property in the absence of consent,estoppel,orsomeotherspecialrule.” InrePubsInc.ofChampaign,618F.2d432,436(7thCir. 1980).

Cases interpretingearlierversions ofthe Illinois Code (whichalsousedthe phrase)describedthree ways inwhichrightsincollateralmaybe obtained:1) the debtor mayhave possessionand title tothe goods; 2) the true ownerconsents to the debtor's useofthe collateralas security; or 3) the true ownerisestopped from denying a security interest. Midwest Decks, Inc. v. Butler & Baretz Acquisitions, Inc., 649 N.E.2d 511 (Ill. App. Ct. 1995).

The remand order specified that only ownership rights are at issue. Stylemaster I concluded that Stylemasterhadpossessionofthemolds,andtheDistrictCourtopinionagreed. StylemasterII,2004U.S. Dist. LEXIS 7485 at *12 n6 (“The Bankruptcy Court made evident its belief that Stylemaster had complete control over the molds and we see no reason to disturb that factual finding. We therefore conclude that, for the purposes of the Midwest Decks test, Stylemaster had "possession" ofthe molds.”)

Stylemaster purchased and thereby acquired title to the Bankruptcy Molds at a court approved sale.ItisthereforeclearthatStylemasterownedthe“BankruptcyMolds.”See AdditionalFindings ofFact, supra, ¶¶ 70-73. Stylemaster had Title to the Cost Reduction and Chicago Molds

The Bank also carried its burden in this litigation of proving that Stylemaster owned the Cost ReductionandChicagoMolds. Kondikv. Ebner (InreStandardFoundryProducts,Inc.),206B.R.475, 478 (Bankr.N. D. Ill. 1997) (“the burdenofprovingthatanitemofpropertyissubjecttoa securityinterest is on the party asserting the interest.”)

A debtor acquires rights in collateral when a debtor obtains title pursuant to a sales contract. See Kunkelv. Sprague NationalBank, 128F.3d636, 641 (8thCir.1997) (holding that debtor had title under itscontractualagreementsand therefore had rights in collateral sufficient to grant a security interest). The

provisions of Article 2 of the Illinois Commercial Code, which governs contracts for the sale of goods,

determine whether Stylemaster obtained title to the molds. See, e.g. Kunkel, 128 F.3d 641 (holding that

it was appropriate for the lower court to look to Article 2 of the UCC to determine whether debtor had

"rights in the collateral."); Federal Deposit Ins. Corp. v. Quality Inns, Inc., 735 F. Supp. 1311, 1316 (D.

Md. 1990) (contractual rights are sufficient for a debtor to acquire rights in collateral).

The Bank contends that each quotation and purchase order exchanged between Stylemaster and

CME and Cost Reductions formed a valid sales contract providing for the purchase of each mold.

According to the Bank, Stylemaster acquired the right to title pursuant to these contracts and title passed

upon delivery. See 810 Ill. Comp. Stat. 5/2-401 (2004) (“unless otherwise explicitly agreed title passes

to the buyer at the time and place at which the seller completes his performance with reference to the

physical delivery of the goods.”)

MatrixcontendsthatStylemasternevergainedtitle,takingthe positionthattheagreementsbetween

Stylemaster and its vendors formed a “sale on approval” transaction. See 810 Ill. Comp. Stat. 5/2-236

(2004). In sale on approval transactions, the buyer does not acquire title until acceptance of the goods.

810 Ill. Comp. Stat. 5/2-237 (2004). In this regard, Matrix argues that CME and Cost Reductions

defaulted under the terms of the contract by failing to deliver conforming goods; the default was never

cured; and Stylemaster never accepted the goods because of their substantial deficiencies.

Whether the Purchase of the Cost Reduction and Chicago Molds Constituted Sale on Approval Transactions

Matrix contends that the following terms and conditions of Stylemaster’s purchase orders

resulted in a sale on approval transaction: CONDITIONS: THE RIGHT ISRESERVEDTOCANCEL THIS ORDER IF DELIVERY IS NOT AS REQUIRED. (Front side of purchase order.)

SUBJECT TO THE TERMS AND CONDITIONS PRINTED ON THE BACK SIDE HEREOF AND TO SPECIFICATIONS, DRAWINGS AND ADDITIONAL TERMS AND CONDITIONS REFERRED TO HEREIN AND/OR ATTACHED HERETO. (Front side.)

This order contains the entire agreement of the parties. No modification thereof willbe binding uponus,unlessinwritingdatedsubsequentlyand signedbyvendor and accepted in writing.

All materials furnished must be as specified. It is our privilege to return at seller’s expense: (a) merchandise received after date, or dates, specified; (b) merchandise shipped in excess of this order; (c) merchandise not according to specifications;

(d) merchandise that is not as represented; (e) defective goods. (Back side of purchase order, term no. 5.)

No goods returned shall be replaced without our formal replacement order. All goods furnished are subject to our approval before acceptance. (Back side, no. 6.)

Substitution must not be made for any items without prior written permission. (Backside, term no. 14)

Pl.’s Rev. Reopened Ex. 4 (emphasis added)

Asale onapprovaloccurswhere“deliveredgoodsmaybe returnedby the buyereventhoughthey

conform to the contract and the goods are delivered primarily for use.” 810 Ill. Comp. Stat. 5/2-326

(2004). In sale on approval transactions the seller delivers goods to the proposed purchaser but they

remainthepropertyoftheselleruntilthebuyeracceptsthem. 810 Ill. Comp. Stat. 5/2-326 (2004), Official

Comment.

Although the Illinois Commercial Code codifies the rights and obligations of the parties where a

transaction is held to be a sale on approval, itissilent asto the factorsthatdistinguishan ordinary contract for sale from a sale on approval transaction. Research reveals no controlling precedent in Illinois. Other jurisdictions, however, have established some guidelines.

A transaction qualifies as a contract for sale on approval when the buyer has an unfettered or absolute right to return the goods irrespective of whether they conform to the contract. In re Alcom Am. Corp., 154 B.R. 97, 111 (Bankr. D.D.C. 1993) (citing Associated Milk Producers, Inc. v. Ind. Dep't of State Revenue, 512 N.E.2d 917, 919 (Ind. Tax Ct. 1987), aff'd, 534 N.E.2d 715 (Ind. 1989)).

In determining whether a buyer has this right, at least one court has held that it is appropriate to examinethe transactiondocumentsand the parties'performance.HoughtonWoodProds.v.BadgerWood Prods., 196 Wis. 2d 457, 464 (Wis. Ct. App. 1995) (concluding that an arbitration provision, provisions allowing the buyer to retain title, invoices providing for an assessment of interest for late payments, and provisions permitting the buyer to complain are inconsistent with a sale on approval transaction.) In this case the terms and conditions do not contain any provisions inconsistent with a sale of approval.

Regardless of whether agreements betweenStylemaster and its vendors are defined as contracts orsaleonapprovaltransactions,Stylemastermusthaveacceptedthemoldstoacquiretitle. 810 Ill. Comp. Stat. 5/2-327 (2004) (“Under a sale on approval unless otherwise agreed ... the risk of loss and the title do not pass to the buyer until acceptance...”).

The sale on approval provisions in Stylemaster’s purchase orders did not apply to every mold in disputehere. Ms. Williams testifiedthatStylemasterchangedtheir purchaseorder forms in2000. The new purchaseordersdidnotcontainthe terms and conditions and Stylemasterstoppedsendingtheoldpurchase orders to its vendors. Matrix disputes this testimony and points to the testimony of Mr. Laverty of CME and Mr. Tanner of Cost Reductions. (Def.’s Br. ¶ 12.)

Testimony regarding this issue by Messrs Tanner and Laverty does not provide a clear answer. Mr.Lavertystatedthat he was vaguely familiar with the terms and conditions but indicatedthathe did not knowwhethertheywerepart of CME’s agreements with Stylemaster. Mr. Laverty also testified that the Stylemasterformschangedduringthecourseoftheirrelationship. (Laverty Reopened Tr. 8/17/04at87.) Mr. Tanner stated that he believed that the terms and conditions applied to all molds sold to Stylemaster but he agreed that the Stylemaster forms changed some time in the year 2000. (Pl.’s Reopened Ex. 65, Tanner Dep. at 3.)

The witness’uncertaintyisunderstandable,given that both vendorssuppliedmoldstoStylemaster forseveralyears. Both witnesses, however, confirmed that Stylemaster’s purchase orders changed in 2000 and accurately identified the old and new purchase orders. That both witnesses recalled the change and were able to distinguish between the old and new purchase orders corroborates Ms. Williams’ testimony.

It must therefore be concluded, that not all contracts executed by Stylemaster for purchase of moldsafter2000 did contain the same terms or sale and approvalprovisions,and notallofthemweresale onapprovalcontracts. This was true of all the CME Molds Reference Number 26, 51, 53-55, 58-59 and Cost Reduction Molds Reference Number 29, 41-50, and 52. (See Pl.’s Reopened Rev. Ex. 70.)

However, none of these differences are material here because even assuming arguendo that all agreements were “sold on approval,” Stylemaster accepted all of the molds in issue.

Stylemaster Accepted the Molds

Under Section 2-606 acceptance occurs when the buyer:

(a)
after a reasonable opportunity to inspect the goods signifies to the seller that the goods are conforming or that he will take or retain them in spite of their nonconformity; or
(b)
fails to make an effective rejection (subsection (1) of Section 2-602 [810 Ill. Comp. Stat. 5/2-602]), but such acceptance does not occur until the buyer has had a reasonable opportunity to inspect them; or

(c)does anyact inconsistent withthe seller'sownership;but if such actiswrongful as against the seller it is an acceptance only if ratified by him.

810 Ill. Comp. Stat. 5/2-606 (2004). The Bank argues Stylemaster accepted each mold after inspecting

its performance during the manufacturing process. Stylemaster notified its vendors of its intention to accept

each mold by approving the final product sample. (Pl.’s Br. ¶ 51.)

Matrixrepliesthatacceptance cannotoccur beforea buyerhasanopportunityto inspectthe mold,

not the product. Matrix argues that the complex nature of the injection molding process required

Stylemastertoputthe moldsintoproductioninordertoevaluateeachmold’sperformancecapability. The

useofthe moldsduringthis evaluationperiodand the productsproducedthereinissaid to have beensimply

part of the inspection period permitted by statute. See United Air Lines Inc v. Conductron Corp., 387

N.E.2d 1272 (Ill. App. Ct. 1979) (“If use of goods is necessary to allow proper evaluation of them, such

use does not constitute acceptance.”); Capital Dodge Sales, Inc. v. Northern Concrete Pipe, Inc., 346

N.W.2d 535 (Mich. Ct. App. 1983) (holding that there is no acceptance unless buyer has a reasonable

opportunity to inspect).

Under the facts demonstrated here, that argument is without merit. First, all the parties to the

contracts testified that their understanding was that a mold was accepted after approval of a final sample.

Matrix contends that this testimony should be barred by the parole evidence rule. That argument was

rejected in Stylemaster I, 296 B.R. 465-467 (holding thatthe thirdpartyexceptionto the parole evidence

rule remains the authority in the Seventh Circuit, and cases cited).

Second and equally important, any arguable defective condition of the molds was not latent. In

some cases the defects were apparent at the moment of delivery. (See Def.’s Reopened Ex. 107C.) In

other cases the defects were apparent after the mold was put into production.7/

Under either scenario, Stylemaster was aware of each mold’s defect either at the moment of

delivery or once the mold was put into production. Despite this knowledge, Stylemaster choose to retain

and use them to manufacture large numbers of its products. Mr. Wenk’s testimony is illustrative in this

regard. He recounted in some detail the problems associated with Mold WX02000 and the frequent

repairs required to run the mold. He admitted, however, that despite the mold’s poor condition and sub

par performance capability the mold was put into heavy volume production.

Furthermore, the evidence suggests that some of the problems with the Contempra Line Molds

were caused by designs submitted by Stylemaster. (Williams Reopened Tr. 8/19/04 at 113-114.)8/

7/ Ms. Williams testified that each mold was put into production as fast as possible to enable the product to reach the market.

8/ Ms. Williams testified as follows: “when we initially built these [molds], they were built, completed, and ready to run, ready for production, and they were in good running condition. However, they didn’t stack the way they should have, so the rib was actually the wrong dimension. So when we designed them, we put the wrong dimension on the stacking rib.” Williams Tr. 8/19/04 at 113-114.

Matrix suggests that the purpose of the inspection period is to encourage the seller and buyer to adjust their bargain and the buyer should not be made to engage in said adjustment at its peril. 1 James & White and Robert S. Summers, Uniform Commercial Code § 8-2 at 436 (4th ed. 1995).

The circumstances of this case do not fit Matrix’s argument. There is no detriment to the buyer when the buyer has knowledge of the defects and nonetheless chooses to retain and pay for the goods. See, e.g. Atl. Aluminum & Metal Distrib. v. Adams, 181 S.E.2d 101, 103 (Ga. Ct. App. 1971) (finding acceptance where buyer made all payments withfullknowledge ofthe claimed defects.) There is also no detriment to the buyer when the buyer contributes to the condition of the goods purchased. For instance, Ms. Williams testified that some of the problems with the Contempra Line Molds were caused by Stylemaster’s flawed designs. (Williams Reopened Tr. 8/19/02 at 113-114.) Matrix did not Establish that it was Stylemaster’s Agent

Accordingto Matrix, Stylemasterretaineditasan agent toreportto Stylemasterwhena mold was acceptable, and Mr. Wenk did not recommend any mold as acceptable. (Wenk’s Reopened Tr. 8/30/04 at 18-23; Def.’s Br. ¶¶ 60-62.) Agency is a consensual fiduciary relationship in which one party, the principal, has the right to control the conduct of another, the agent, and the agent has the power to affect thelegalrelationshipofthe principal. Kaporovskiy v. GrecianDelightFoods,Inc.,787N.E.2d268,271 (Ill. App. Ct. 2003). A party may establish the existence and extent of an agency relationship through circumstantialevidencefromwhichit can be inferred thatanagencyrelationshipexisted. HPIHealthCare Serv., Inc. v. Mt. Vernon Hosp., Inc., 545 N.E. 2d 677, 680 (Ill. 1989). Nevertheless, the plaintiff must still prove specific facts regarding the circumstances of the situation from which the existence of the relationship can be inferred. Id. at 680. The party alleging an agency relationship has the burden of proving it by a preponderance of the evidence. Mitchell Buick & Oldsmobile Sales, Inc. v. National Dealer Serv.,

Inc., 485 N.E.2d 1281, 1287 (Ill. App. Ct. 1985).

Matrix argues that an agency relationship was established pursuant to an oral contract. Matrix’s

primary evidence is the testimony ofMr. Wenk who testified that Ms. Williams asked Matrix to serve as

Stylemaster’s tooling, engineering, and debugging manufacturer. He stated that Ms. Williams relied upon

his advice as to the status of each mold and its production capabilities. (Wenk Reopened Tr. 8/23/04 at

177.)

Wenk also testified that he attended meetings with Cost Reductions on Stylemaster’s behalf,

assistedinthe designofmanyofthe molds,and maderecommendations toMs. Williams as towhichmolds

were or were not acceptable. (Wenk Reopened Tr. 8/30/04 at 22-24.)

Thattestimonybyitselfdidnotestablishanagencyrelationship. It has long been held under Illinois

law that neitherthe factnorthe extent ofan agency can be proved solely by declarations of the purported

agent. Kapelski v. Alton & Southern R.R., 343 N.E.2d 207, 210 (Ill. App. Ct. 1976). Rather, agency

must normally be established by evidence of acts of the principal or the statements of the principal to the

agent or third persons. Weil, Freiburg & Thomas, P.C. v. Sara Lee Corp., 575 N.E.2d 1344, 1349 (Ill.

App. Ct. 1991).

Matrixdid not produceanycorroboratingevidencefromMs. Williams oranyotherrepresentative

from Stylemaster. Nor has Matrix pointed to any other evidence besides Mr. Wenk’s testimony.9/

9/ Matrix cites as additional evidence a report produced by MidWest Die Company. Def.’s Br ¶ 60. That report was admitted only to prove notice and its contents will not be considered.

Indeed, the testimonyofthe purported principal’s representative, Ms. Williams, contradictedMr.

Wenk’s testimony. She stated that she relied on Mr. Wenk’s advice but was not bound by it. Mr. Wenk

admitted as much under cross examination.10/ Based on the foregoing, Matrix has not established the

existence of an agency relationship.

Giventhatmany of the molds were patently defective, Stylemaster had no reason not to notify its

vendors of the defects in the goods within a reasonable time after delivery. Stylemaster was apparently in

frequent contact with both CME and Cost Reductions regarding the repair work for the molds. But there

is also no evidence of notification to CME or Cost Reductions of Stylemaster’s intent to reject the molds.

Not only did Stylemaster fail to reject the molds, it customized, retained and used the molds in heavy

volume production over a substantial period of time.

This history shows conduct entirely inconsistent with the seller’s continued ownership. See The

Softa Group, Inc v. Scarsdale Development, 632 N.E.2d 13 16 (Ill. App. Ct. 1993); Sherwin-Williams

Co. v. March Charcoal Co., Inc., No. 80 C 4541, 1985 U.S. Dist. LEXIS 13846 at *8-9 (N.D. Ill. Nov.

15, 1985) (holding that when a buyerhasusedthe goodsprovidedbythe seller,he cannot later claim that

he has not accepted them); Am. Theater Co. v. Siegel-Cooper & Co., 77 N.E. 588 (Ill. 1906) ("The law

does not permit a person to receive goods under a contract, appropriate them for his own use, and then

10/ Mr. Wenk testified as follows: Q:Andbaseduponyourexpertiseand thatopinion, youadvisedMs.Williams,Stylemaster,thatshe should actually send these molds back to the moldmaker?

A: I said if I were you, Martha, on some of these, I would definitely reject these molds.

Q: Do you know if she ever did that?

A: I know she didn’t do that.
(Wenk Reopened Tr. 8/30/04 at 32.)

defeat an action for the purchase price on the ground that the goods were not of the exact quality or description called for by the contract.")

Matrix asserts that Stylemaster revoked any acceptance by returning the molds for repair. This argument also fails. Stylemaster returned the molds only for some repairs or adjustments, but after repairs were completed the molds were returned to it for further use in large scale production. Furthermore, Stylemaster lost its right to revoke acceptance by its exercise of ownership over the goods. Foley & Co.

v. Excelsior Stove & Manuf. Co., 265 Ill. App. 78 (Ill. App. Ct. 1932) (use of 8,000 catalogs of 25,000 printed constitutes acceptance of all of them); Sherwin-Willaims Co v. Mark Charcoal Co., 1985 U.S. Dist.LEXIS13846(holdingthata buyercannotrevokeacceptance ifitexercisesdominionoverthe goods or permits them to be altered or changed while in its control).

On the basis of this evidence, it must be concluded that Stylemaster accepted each mold, and therefore owned them when it granted lien rights to the Bank. Consequently, the Bank has a properly perfected, valid, enforceable, first priority lien in each of the following plastic molds owned by the debtor Stylemaster:

- 29

1. 5991 B1 14. 5990 L1 27. 5990 B1 40. 5895 B 53. 2030 L2
2. 5991 L1 15. 5500 L 28. 9005 B 41. 8960 B 54. 6502 L
3. 5502 B1 16. 1081 B 29. 8040 L 42. 2042 L 55. 6980 L
4. 1062 B 17. 1082 B 30. 8932 C 43. 2042 B 56. 2060 B
5. 5502 L1 18. 1083B 31. 8932 X 44. 2032 B 57. 4300 B
6. 1063 B 19. 1084 B 32. 5995 R 45. 2000 X 58. 4300 H
7. 1064 B 20. 8810 L 33. 8932 W 46. 2030 L1 59. 6990 L
8. 1061 B 21. 8010L 34. 8932 H 47. 2024 B 60. 6991 L
9. 1061 L 22. 8815 B 35. 8960 H 48. 2030 B 61. 5990 B2
10. 1062 L 23. 5980 B1 36. 5895 L 49. 2022 L 62. 6980 B/I
11. 1063 L 24. 5980L1 37. 9005 L 50. 2022 B
12. 1064 L 25. 8815 F 38. 8960 L 51. 2050 B
13. 5500 B 26. 6000 X 39. 8060 L 52. 2060 L

CONCLUSION

Based on the foregoing and on the original Findings of Fact and Conclusions of Law, it is again

concluded that Debtor held ownership rights in the subject molds as to which it granted a lien thereon to

the Bank.

ENTER:

Jack B. Schmetterer

United States Bankruptcy Judge Entered this 13th day of January 2005

 

Back to Bankruptcy Articles

 

This website contains legal information, and not legal advice.
It's content refers only to the law of the State of Illinois.
 
We are a debt relief agency. We help people file for bankruptcy relief under the Bankruptcy Code.